Search Jobs
Browse the latest opportunities at TPI.
Tech Providers, Inc.
https://techproviders.com/wp-content/uploads/2022/06/Logo-Color.png
https://techproviders.com
https://techproviders.com
true
Electrical Engineer 4/5
Overland Park, KS US
Posted: 06/01/2023
2023-06-01
2023-10-21
Job Number: 19872555
Job Description
Job Title: Electrical Engineer Level 4/5
Duration: 1+ year with possible extension
Location: Remote
Some overtime, but typically 40 hours a week.
For Level 4- PE license, 5-6 years’ experience.
Substation design, QA checking and project lead, performing calculations within substations.
Can go onsite for site visit but not doing field work.
Substation Design with High Voltage over 60-Watt experience
Bluebeam
Utility based- 69 KV most experience, some with 500 KV, 34.5 KV with utility-based experience.
Substation transmission side. 34KV or above.
50% P&C but need physical as well-high voltage substation-can be combined as well. Depends on size of the job.
Design role based out of Bluebeam experience or EDF Adobe make mark-ups on.
Help translates to Bluebeam.
Send to drafter to put in CAD or MicroStation then send back to check.
For Level 5- Active PE License- 8 years’ experience
Leading the projects.
Managerial task- QA and QC. Technical as well, 8 years.
Can go onsite for site visit but not doing field work.
Substation Design with High Voltage over 60-Watt experience
Bluebeam
Utility based- 69 KV most experience, some with 500 KV, 34.5 KV with utility-based experience.
Substation transmission side. 34KV or above.
50% P&C but need physical as well-high voltage substation-can be combined as well. Depends on size of the job.
Design role based out of Bluebeam experience or EDF Adobe make mark-ups on.
Help translates to Bluebeam.
Send to drafter to put in CAD or MicroStation then send back to check.
Duration: 1+ year with possible extension
Location: Remote
Some overtime, but typically 40 hours a week.
For Level 4- PE license, 5-6 years’ experience.
Substation design, QA checking and project lead, performing calculations within substations.
Can go onsite for site visit but not doing field work.
Substation Design with High Voltage over 60-Watt experience
Bluebeam
Utility based- 69 KV most experience, some with 500 KV, 34.5 KV with utility-based experience.
Substation transmission side. 34KV or above.
50% P&C but need physical as well-high voltage substation-can be combined as well. Depends on size of the job.
Design role based out of Bluebeam experience or EDF Adobe make mark-ups on.
Help translates to Bluebeam.
Send to drafter to put in CAD or MicroStation then send back to check.
For Level 5- Active PE License- 8 years’ experience
Leading the projects.
Managerial task- QA and QC. Technical as well, 8 years.
Can go onsite for site visit but not doing field work.
Substation Design with High Voltage over 60-Watt experience
Bluebeam
Utility based- 69 KV most experience, some with 500 KV, 34.5 KV with utility-based experience.
Substation transmission side. 34KV or above.
50% P&C but need physical as well-high voltage substation-can be combined as well. Depends on size of the job.
Design role based out of Bluebeam experience or EDF Adobe make mark-ups on.
Help translates to Bluebeam.
Send to drafter to put in CAD or MicroStation then send back to check.
Meet Your Recruiter
Robert Reed
Share This Job:
Related Jobs:
There are currently no related jobs. Please sign up for Job Alerts.
Loading...
Login to save this search and get notified of similar positions.